Software Testing Event, Sophia Antipolis, September 15, 2026

Test, Maintenance, Score

Estimate the maintenance cost of your automated tests. Then determine the portion that does not fix a bug.

25hours per month
300hours per year
40days a year

A workday is 7.5 hours. The calculation is performed in your browser; no data is sent.

How many of those hours actually required a human?

Most test failures aren't bugs. A label changes, a button moves, an environment responds incorrectly, or game data has expired. The test stops for a valid reason, but it didn't find anything.

Until this breakdown is measured, the figure above remains an overall cost. You know how much you're paying. You don't know what you're paying for.

The table below will help you find out. Record your next twenty failures as they happen, without changing anything about the way you work.

Maintenance Score Test, Assessment Grid
  • A real application bug. The test found an actual defect.
  • UI: A legitimate interface change. The product has changed; the test must follow suit.
  • Flaky instability or flaky test. Same code, different result.
  • Outdated data or selector. The test set or selector has become outdated.

Nothing is saved on this page. Download the form or print it out to fill it in as you go.

Ranking Table for Twenty Consecutive Losses
No.ScreenplayBugUIFlakyData
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0 losses out of 20 rated matches
– None of these failures were caused by a bug
Bug 0 · UI 0 · Flaky 0 · Data 0

Resource from the talk given on September 15, 2026, at the Software Testing Night in Sophia Antipolis. Mr Suricate, a French provider of a no-code automated testing platform.